Alix Wilton Regan on Becoming Lara Croft in Tomb Raider: Legacy of Atlantis | IGN Live 2026 (2026)

Alix Wilton Regan, the talented actress behind the iconic Lara Croft in the upcoming Tomb Raider: Legacy of Atlantis, is set to bring the character's legendary 90s sass into the modern era. In this exclusive interview, Regan delves into the challenges and joys of embodying Lara Croft, a British and global cultural icon. She reveals the meticulous process of maintaining distinct personalities across different ages of Lara, showcasing her dedication to the role.

Regan's enthusiasm for the character is palpable. She describes Lara as a symbol of self-assurance, exuding confidence in her abilities, intellect, and physical prowess. This portrayal, she explains, is a delicate balance, requiring a deep understanding of the character's evolution over time. The actress is particularly excited about the iconic lines from the original Tomb Raider, infusing them with a contemporary twist, a nod to the 90s sass that defined the character's early days.

The physical demands of motion capture (mocap) work, according to Regan, are a significant aspect of the role. She humorously recalls the intense three-week shoots, where the heat and sweat become a part of the experience, creating an intimate bond with her co-stars. Yet, it's Lara's on-screen presence that keeps her motivated, describing her as 'smoking hot' and a source of inspiration during long days in the mocap suit.

Tomb Raider: Legacy of Atlantis, set for release on February 12, 2027, on Nintendo Switch 2, PS5, PC, and Xbox Series X/S, promises to be a thrilling adventure. Regan's portrayal of Lara Croft, both in the remake and the upcoming Tomb Raider: Catalyst, is highly anticipated. Her dedication to the character's development and the intricate details she brings to each iteration will undoubtedly captivate fans and newcomers alike, ensuring Lara Croft's legacy continues to thrive in the 21st century.

Alix Wilton Regan on Becoming Lara Croft in Tomb Raider: Legacy of Atlantis | IGN Live 2026 (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Frankie Dare

Last Updated:

Views: 5904

Rating: 4.2 / 5 (73 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Frankie Dare

Birthday: 2000-01-27

Address: Suite 313 45115 Caridad Freeway, Port Barabaraville, MS 66713

Phone: +3769542039359

Job: Sales Manager

Hobby: Baton twirling, Stand-up comedy, Leather crafting, Rugby, tabletop games, Jigsaw puzzles, Air sports

Introduction: My name is Frankie Dare, I am a funny, beautiful, proud, fair, pleasant, cheerful, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.