Dodgers' Brusdar Graterol: What's Next After Shoulder Surgery? (2026)

Dodgers' Brusdar Graterol's Season Start in Doubt: A Tale of Recovery and Resilience

GLENDALE, Ariz. (AP News) -- The Los Angeles Dodgers' relief pitcher, Brusdar Graterol, is facing a challenging road to recovery. Graterol, a 27-year-old right-hander, is expected to miss the start of the season as he continues his comeback from a torn labrum surgery. This news comes as a setback for the team, who are taking a cautious approach to Graterol's return.

Graterol's last appearance for the Dodgers was in the 2024 World Series, where he played a crucial role. However, his journey to the World Series was not without hurdles. After the surgery on his right shoulder in November 2024, Graterol made a brief comeback during the regular season, appearing in seven relief games with a 2.45 ERA in 7 1/3 innings. But shoulder inflammation and a hamstring strain forced him to take a break.

In January, Graterol signed a $2.8 million contract for the current season, avoiding salary arbitration. This contract ensures he remains with the Dodgers until next offseason, when he can become a free agent. Despite his limited innings (181 over five seasons), Graterol has shown promise, with a 2.78 ERA and 11 saves to his name.

The Dodgers acquired Graterol from the Minnesota Twins in 2020, in a trade that sent Kenta Maeda to the Twins. Now, as Graterol battles to regain his form, the team must navigate the challenges of a delayed season start. Will Graterol be able to bounce back and contribute to the Dodgers' success? Only time will tell. But here's where it gets interesting... The Dodgers' cautious approach raises questions about the team's strategy and the potential impact on their season. Will Graterol's absence be a significant setback, or can the team adapt and find success without him? The answer lies in the heart of the Dodgers' resilience and determination.

Dodgers' Brusdar Graterol: What's Next After Shoulder Surgery? (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Jonah Leffler

Last Updated:

Views: 5482

Rating: 4.4 / 5 (65 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Jonah Leffler

Birthday: 1997-10-27

Address: 8987 Kieth Ports, Luettgenland, CT 54657-9808

Phone: +2611128251586

Job: Mining Supervisor

Hobby: Worldbuilding, Electronics, Amateur radio, Skiing, Cycling, Jogging, Taxidermy

Introduction: My name is Jonah Leffler, I am a determined, faithful, outstanding, inexpensive, cheerful, determined, smiling person who loves writing and wants to share my knowledge and understanding with you.