Horwich Residents Call for Speed Cameras on Chorley New Road (2026)

The Perils of a Busy Road

The residents of Horwich, a town nestled in the bustling streets of Chorley New Road, are raising their voices in unison, demanding action against the dangers lurking on their doorstep. It's a tale of near misses, reckless driving, and a seemingly invisible zebra crossing.

What's particularly alarming is the sheer frequency of these incidents. Locals report daily near-collisions, a testament to the urgency of the situation. The road, it seems, has become a playground for speedsters, with vehicles zipping past at alarming rates, often exceeding the 30 mph limit. This raises a crucial question: Why has this road become a haven for speed demons?

One resident, Joanne Urmston, highlights the faded zebra crossing, suggesting a fresh coat of paint might help. But the issue runs deeper than a simple repaint. The real concern is the alarming disregard for pedestrian safety. Drivers, seemingly oblivious to their surroundings, barrel through the crossing, often failing to notice pedestrians. This is a recipe for disaster and underscores the need for heightened awareness and stricter enforcement.

Graham Ross, a long-time resident, echoes the call for action. He proposes speed cameras as a potential solution, and rightfully so. The road, especially during the late evenings, transforms into a speedway, with vehicles racing past. The potential revenue from fines, as Mr. Ross points out, is a secondary benefit. The primary goal should be to deter reckless driving and ensure the safety of both pedestrians and motorists.

The recent crash near Winter Hey Lane serves as a stark reminder of the potential consequences. While the local council has expressed interest in improving the crossing lights, the residents' plea for speed cameras should not fall on deaf ears. The police, in collaboration with the council, must take these concerns seriously and consider implementing measures to curb speeding.

In my opinion, this situation highlights a broader issue of road safety and the need for proactive measures. It's not just about penalizing speedsters but creating an environment where pedestrians and motorists coexist safely. The residents' concerns are valid, and their voices should be a catalyst for change. It's time to reclaim the streets and make Chorley New Road a safer place for all.

Horwich Residents Call for Speed Cameras on Chorley New Road (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Sen. Ignacio Ratke

Last Updated:

Views: 6059

Rating: 4.6 / 5 (56 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Sen. Ignacio Ratke

Birthday: 1999-05-27

Address: Apt. 171 8116 Bailey Via, Roberthaven, GA 58289

Phone: +2585395768220

Job: Lead Liaison

Hobby: Lockpicking, LARPing, Lego building, Lapidary, Macrame, Book restoration, Bodybuilding

Introduction: My name is Sen. Ignacio Ratke, I am a adventurous, zealous, outstanding, agreeable, precious, excited, gifted person who loves writing and wants to share my knowledge and understanding with you.