Iowa State Cyclones CRUSH No. 1 Purdue! Are They the BEST Team in College Basketball? 🔥 (2026)

Get ready for a thrilling ride as we dive into the world of college basketball and uncover the incredible story of Iowa State's rise to dominance!

The Undefeated Cyclone Storm

Iowa State has been on an absolute tear, and their recent victory over the top-ranked Purdue team is a testament to their incredible prowess. But here's the real scoop: Iowa State isn't just winning; they're dominating, and their performance against Purdue was just the latest chapter in an impressive streak.

A Dangerous Force on the Court

Iowa State's success isn't a fluke. They've proven themselves as one of the most dangerous teams in college basketball, excelling in both offense and defense. Their shooting prowess is off the charts, hitting an incredible 11 three-pointers against Purdue, and their defensive game is equally impressive, holding Purdue to their lowest scoring output of the season by a significant margin.

Undefeated and Climbing the Ranks

With a perfect record of 9-0, Iowa State has earned their spot in the AP Top 10. But their journey doesn't stop there. Let's take a closer look at some key stats and highlights:

  • Iowa State dominated the Players Era Festival in Las Vegas, going 3-0 and leaving Sin City as the only undefeated team.
  • Their shooting accuracy is mind-boggling. Against Purdue, they shot an impressive 47.8% from the three-point line, and against Alcorn State, they set a program record with a 73% success rate from long distance.
  • Milan Momcilovic, a standout player, is making waves with his exceptional performance. Against Purdue, he scored 20 points, and his season average of 53.6% from the three-point line is nothing short of remarkable.

A Surprise Team with a Big Impact

Iowa State's rise has been a pleasant surprise for many, and they've certainly made their mark on the early 2025-26 season. With a win against Purdue, they've handed the team their first home non-conference loss since 2019. Next up is a showdown with Iowa, and we can't wait to see what the Cyclones have in store.

A Star Returns

Cyclones guard Tamin Lipsey made a triumphant return to the court after missing three games due to a groin injury. He put up an impressive performance against Purdue, tallying 9 points and 8 assists with zero turnovers in 32 minutes of play.

Purdue's Stumble

Purdue, a powerhouse in their own right, had an off day against Iowa State. National player of the year candidate Braden Smith had an uncharacteristic performance with 6 turnovers, and Trey Kaufman-Renn's scoring was well below his usual output. The Boilermakers, known for their high-scoring games, were held to just 58 points, a stark contrast to their usual 80+ point games.

A Historic Achievement

Iowa State's victory over Purdue isn't just a win; it's a historic achievement. Only one program in history has multiple wins over #1 teams by 20+ points, and Iowa State has accomplished this feat in a span of just 21 months. Their victory over #1 Houston in March 2024 was followed by their recent triumph over #1 Purdue in December 2025.

So, what do you think? Is Iowa State the real deal, or is this just a hot streak? We'd love to hear your thoughts in the comments! Let's discuss and celebrate the exciting world of college basketball together!

Iowa State Cyclones CRUSH No. 1 Purdue! Are They the BEST Team in College Basketball? 🔥 (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Ouida Strosin DO

Last Updated:

Views: 6032

Rating: 4.6 / 5 (56 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Ouida Strosin DO

Birthday: 1995-04-27

Address: Suite 927 930 Kilback Radial, Candidaville, TN 87795

Phone: +8561498978366

Job: Legacy Manufacturing Specialist

Hobby: Singing, Mountain biking, Water sports, Water sports, Taxidermy, Polo, Pet

Introduction: My name is Ouida Strosin DO, I am a precious, combative, spotless, modern, spotless, beautiful, precious person who loves writing and wants to share my knowledge and understanding with you.