Jarrett Stidham: From Backup to Broncos' AFC Championship Hope (2026)

The Denver Broncos, a powerhouse in the NFL, are facing a pivotal moment in their playoff journey. With starting quarterback Bo Nix out for the remainder of the playoffs due to a season-ending ankle injury, the spotlight shifts to his backup, Jarrett Stidham. But here's where it gets intriguing...

Stidham, a 29-year-old veteran, has been a reliable presence on the sidelines for seven NFL seasons, appearing in 20 games with four starts. However, his experience doesn't extend to the postseason, adding an element of uncertainty to his upcoming challenge.

The Broncos signed Stidham in 2023, initially as a backup to the legendary Russell Wilson. Stidham's journey began with the New England Patriots, who drafted him in 2019. He spent three seasons in New England, backing up Tom Brady and Cam Newton, before being traded to the Las Vegas Raiders for the 2022 season.

In Las Vegas, Stidham found himself in a unique situation. He started two regular-season games, including a memorable debut where he threw for 365 yards and three touchdowns. Despite this promising start, the Raiders benched Derek Carr and named Stidham the starter for the final two games of the season.

The Broncos brought Stidham back in 2023, and he once again served as a backup, this time to Wilson. When Wilson was benched, Stidham stepped in for the final two games of that season. In 2024, Stidham competed with Nix for the starting job, but the Broncos opted for their first-round pick, Nix.

Now, Stidham gets his chance to shine in the AFC Championship Game, a stage he's never graced before. The Broncos' last appearance in this game was in 2015, when Peyton Manning led them to victory over the New England Patriots, en route to winning Super Bowl 50.

Can Stidham step up and lead the Broncos to glory? Will he be able to fill the void left by Nix? These questions will be answered as Stidham takes center stage. And this is the part most people miss: Stidham's journey is a testament to the resilience and dedication required in the NFL.

What do you think? Will Stidham rise to the occasion, or will the pressure be too much? Feel free to share your thoughts and predictions in the comments!

Jarrett Stidham: From Backup to Broncos' AFC Championship Hope (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Jerrold Considine

Last Updated:

Views: 5694

Rating: 4.8 / 5 (58 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Jerrold Considine

Birthday: 1993-11-03

Address: Suite 447 3463 Marybelle Circles, New Marlin, AL 20765

Phone: +5816749283868

Job: Sales Executive

Hobby: Air sports, Sand art, Electronics, LARPing, Baseball, Book restoration, Puzzles

Introduction: My name is Jerrold Considine, I am a combative, cheerful, encouraging, happy, enthusiastic, funny, kind person who loves writing and wants to share my knowledge and understanding with you.