Makina Cassiel II Review: A Bold Brutalist Chronograph from the Philippines (2026)

The Makina Cassiel II is a bold and distinctive timepiece that challenges traditional watch design norms. This Philippine microbrand has crafted a watch that is both visually striking and technically impressive, offering a fresh take on the chronograph. With a price tag of US$1,850 during the presale period, it sits in a competitive market, but its unique design may be a deal-breaker for some. So, is it worth the hype? Let's delve into the details and explore why this watch is more than just another timepiece.

A Design-First Approach

Makina has always been known for its industrial design-inspired watches, and the Cassiel II is no exception. The brand's bio on its website hints at a design philosophy that prioritizes form over function, which is a refreshing change in the watch world. Most brands tend to justify their designs through functionality, but Makina embraces the idea of form taking precedence. This approach is evident in the Cassiel II's sharp surfaces, contrasting finishes, and unconventional display layout, creating a watch that is as much a work of art as it is a functional timepiece.

A Visual Leap from the Original

The Cassiel II is a significant departure from its predecessor, the original Cassiel. While the name remains, the watch now embodies Makina's current visual language, characterized by angular cases and architectural dial designs. This evolution makes sense, as the Cassiel II feels more aligned with the brand's identity. However, it also means that those familiar with the original Cassiel might find it less recognizable, as the Cassiel II has a distinct personality of its own.

Industrial Elegance

The watch's 42mm case, with a 40mm bezel diameter and 48mm lug-to-lug length, might initially appear substantial. However, Makina has cleverly reduced the visual bulk through angular flanks, a tapered case back, and sandblasted surfaces, giving the Cassiel II a sculptural aesthetic. The polished accents provide a subtle contrast, ensuring the design doesn't lose its industrial grit. I'm eager to see how this design choice affects the watch's perceived proportions in real life.

Integrated Strap and Unconventional Dial

One of the Cassiel II's standout features is its integrated rubber strap. Makina's asymmetrical approach to the strap's design, with different patterns on each side, adds to the watch's overall character. It's a detail that shows the brand's attention to the smallest elements, ensuring the strap feels like an extension of the case. The dial, too, is a work of art, with rotating discs and cut-out displays integrated into a layered structure. The matte black surface, with subtle graphite gray tones, avoids reflections and ensures nighttime legibility through ample lume.

Under the Hood: The Valjoux/ETA 7750 Movement

Powering the Cassiel II is the Valjoux/ETA 7750 automatic chronograph movement, a well-known caliber in the industry. With a frequency of 28,800vph (4Hz) and a power reserve of 44-48 hours, it offers the reliability and performance expected from a chronograph. The layout, with the day-date window at 3 o'clock and sub-dials at 6, 9, and 12, is universally recognizable, and Makina's custom black rotor adds a touch of individuality. However, the source of the caliber remains a mystery, as ETA no longer provides it to microbrands.

Standing Out in a Saturated Market

The Makina Cassiel II is a watch that dares to be different. Its angular case, industrial aesthetic, and unconventional dial layout are a bold statement in a market saturated with familiar designs. While this approach may not appeal to everyone, it is refreshing to see a brand taking risks and offering something genuinely original. The Cassiel II is a testament to Makina's commitment to design-first principles, and it will undoubtedly attract those seeking a timepiece that stands out from the crowd.

A Competitive Price Point

During the presale period, the Cassiel II is priced at US$1,850, which is competitive in the microbrand segment. However, the price is expected to rise to US$2,100 or more after the presale, which is a significant jump. This price hike raises questions about the watch's value proposition, especially considering the availability of other high-quality chronographs in the same price range. Makina will need to ensure that the Cassiel II's unique design and features justify the higher price point.

Final Thoughts

The Makina Cassiel II is a watch that demands attention and sparks curiosity. Its design-first approach, combined with a powerful movement and a unique dial, makes it a compelling offering in the microbrand space. However, the high price tag and unconventional design may be a barrier for some. For collectors seeking something genuinely different, the Cassiel II is a must-see, but it will be interesting to see how the market responds to its bold statement. Personally, I find the watch's industrial elegance and unconventional design fascinating, and I'm eager to see how it performs in real-world settings. Will it live up to the hype? Only time will tell.

Makina Cassiel II Review: A Bold Brutalist Chronograph from the Philippines (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Amb. Frankie Simonis

Last Updated:

Views: 6280

Rating: 4.6 / 5 (76 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Amb. Frankie Simonis

Birthday: 1998-02-19

Address: 64841 Delmar Isle, North Wiley, OR 74073

Phone: +17844167847676

Job: Forward IT Agent

Hobby: LARPing, Kitesurfing, Sewing, Digital arts, Sand art, Gardening, Dance

Introduction: My name is Amb. Frankie Simonis, I am a hilarious, enchanting, energetic, cooperative, innocent, cute, joyous person who loves writing and wants to share my knowledge and understanding with you.