Max Holloway's UFC Featherweight Rankings: Where Does Conor McGregor Stand? (2026)

The world of MMA is buzzing with the news that Max Holloway, a true legend of the sport, has ranked Conor McGregor at the very bottom of his all-time great featherweight list. This ranking has sparked a heated debate among fans and experts alike, with many questioning Holloway's criteria and others nodding in agreement.

The Criteria: Title Defences

Holloway's primary reason for placing McGregor so low is his lack of title defences. Despite McGregor's impressive victories over Holloway himself and the legendary Jose Aldo, the Hawaiian fighter believes that McGregor's failure to defend the belt diminishes his legacy in the featherweight division.

McGregor's Rise and Fall

McGregor's rise to fame was nothing short of meteoric. He defeated Aldo, Mendes, and Poirier, but his subsequent move up in weight and pursuit of double-champion status left the featherweight division behind. This absence, in Holloway's eyes, is a crucial factor in assessing McGregor's impact and longevity at 145lb.

Holloway's Perspective

When asked to rank the five divisional champions, Holloway's favorite is Aldo, followed by Volk. He acknowledges the media's perspective, which might favor Ilia Topuria due to his impressive wins. Holloway, however, places McGregor at the bottom, stating, "Conor just won it one time and boom, he disappeared and became a double champ."

The Legacy Debate

This ranking has reignited the debate over McGregor's legacy. Should his impact be measured solely by his title defences, or does his overall record and impact on the sport deserve more recognition? McGregor himself believes he should be remembered as the greatest featherweight, but Holloway's ranking suggests otherwise.

A Deeper Look

What makes this particularly fascinating is the subjective nature of legacy. Different fighters and fans will prioritize different aspects of a fighter's career. Some may value title defences, while others might focus on the quality of opponents defeated or the impact on the sport's popularity.

The Upcoming Fight

As McGregor prepares for his return at UFC 329, this ranking adds an interesting layer to the narrative. With the pair set to compete again, this time at welterweight, McGregor has a chance to prove his legacy as an all-time great, not just at featherweight but across multiple weight classes.

Final Thoughts

In my opinion, this ranking highlights the complex nature of sports legacy. It's a reminder that while statistics and achievements are important, the interpretation and perception of those achievements can vary greatly. It's a fascinating discussion that adds depth to the sport and keeps fans engaged. Personally, I think it's a healthy debate that keeps the MMA community vibrant and passionate.

Max Holloway's UFC Featherweight Rankings: Where Does Conor McGregor Stand? (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Annamae Dooley

Last Updated:

Views: 6413

Rating: 4.4 / 5 (65 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Annamae Dooley

Birthday: 2001-07-26

Address: 9687 Tambra Meadow, Bradleyhaven, TN 53219

Phone: +9316045904039

Job: Future Coordinator

Hobby: Archery, Couponing, Poi, Kite flying, Knitting, Rappelling, Baseball

Introduction: My name is Annamae Dooley, I am a witty, quaint, lovely, clever, rich, sparkling, powerful person who loves writing and wants to share my knowledge and understanding with you.