Nanlux YK-E-EVL Motorised Yoke-L for Evoke 5000B/2400B LED Spotlights | Unboxing & Review (2026)

Nanlux's Revolutionary Motorised Yoke-L: Transforming Lighting Control

The Lighting Revolution is Here! Nanlux has unveiled the YK-E-EVL Motorised Yoke-L, a game-changer for controlling the Evoke 5000B and 2400B LED spotlights. Say goodbye to cumbersome manual adjustments and hello to seamless, efficient lighting control.

But here's the real game-changer: this motorized yoke significantly reduces physical strain and enhances on-set safety. No more struggling to aim and reposition heavy lights! Its IP66-rated design ensures smooth operation in any weather, making it the perfect companion for the Evoke series.

Freedom of Movement: The yoke provides an impressive range of motion, covering 540° pan and 270° tilt. This means less time spent adjusting fixtures and more time for creativity. And it's lightning-fast, completing a full pan in just 47 seconds and tilt in 26 seconds.

Safety and Strength: Crafted from magnesium alloy, the yoke is a powerhouse of strength and durability. It effortlessly supports heavy setups, like the Evoke 5000B with the FL-45E Fresnel lens. The high-torque motor provides 40 N·m of power, ensuring smooth adjustments and maintaining stability.

And this is the part most people miss: an innovative self-locking mechanism prevents accidental slippage, keeping your setup secure. Plus, manual adjustments are a breeze with the quick-release plate and T-handle.

Installation Made Easy: Setting up the yoke is a breeze. For the Evoke 5000B, simply attach the quick release plates and connect the extension cable. With the Evoke 2400B, use the included adapters and DMX cable. It's that simple!

Mount it on light stands or trusses up to 60 mm in diameter with the provided adapter, ensuring versatility for various setups.

Control at Your Fingertips: The yoke offers a variety of control methods. The control panel allows for precise adjustments, while the CENTER button resets the yoke instantly. Wired and wireless options include EXT, DMX, LAN, Bluetooth, and the Nanlink App, catering to all preferences.

On-the-Go Convenience: The included flight case is a production essential. Made of durable aluminum alloy with rolling wheels, it's perfect for on-set use and frequent travel.

Key Features:
- Evoke 5000B/2400B compatibility
- Dual-axis adjustment
- Pan: 540°, Tilt: 270°
- Magnesium alloy with high payload
- IP66 protection
- Self-locking for safety
- Manual adjustment support
- Mounts on stands or trusses
- Control via wired/wireless methods

The YK-E-EVL Motorised Yoke-L is available now, starting at $2,290 USD for the standard kit and $2,490 USD for the flight case kit, excluding taxes. See it in action at the BSC Expo in London this week.

What do you think about this innovative lighting solution? Are you ready to upgrade your lighting setup with this cutting-edge technology? Share your thoughts and let's spark a conversation about the future of lighting control!

Nanlux YK-E-EVL Motorised Yoke-L for Evoke 5000B/2400B LED Spotlights | Unboxing & Review (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Edmund Hettinger DC

Last Updated:

Views: 5889

Rating: 4.8 / 5 (78 voted)

Reviews: 93% of readers found this page helpful

Author information

Name: Edmund Hettinger DC

Birthday: 1994-08-17

Address: 2033 Gerhold Pine, Port Jocelyn, VA 12101-5654

Phone: +8524399971620

Job: Central Manufacturing Supervisor

Hobby: Jogging, Metalworking, Tai chi, Shopping, Puzzles, Rock climbing, Crocheting

Introduction: My name is Edmund Hettinger DC, I am a adventurous, colorful, gifted, determined, precious, open, colorful person who loves writing and wants to share my knowledge and understanding with you.