NBL26: Phoenix vs Adelaide | Sobey Out, Who Steps Up? (2026)

The Phoenix's Star Power Fades: Nathan Sobey's Absence Looms Large for Sunday's Showdown

The South East Melbourne Phoenix are facing a significant setback as they prepare to take on the Adelaide 36ers on Sunday. The team's star guard, Nathan Sobey, has been ruled out due to illness, leaving a void in their lineup that could prove challenging to fill.

Sobey, a top contender for the MVP title, has been on an exceptional run in the NBL26 season. His average of 22.8 points per game, including a remarkable 24 points in the last five games, has been a driving force for the Phoenix's success. With three games still to play, the Phoenix find themselves three games behind the ladder-leading 36ers, and Sobey's absence could be a decisive factor in their pursuit of the top spot.

The Phoenix's social media channels confirmed the news on Saturday, informing fans that Sobey would be out for the foreseeable future. This development comes as a blow to the team's morale and their chances of securing a top-two finish, which would secure them a favorable playoff draw.

As the Phoenix and Adelaide 36ers prepare to face off at 2.30 pm AEDT, live on ESPN and 10, the question remains: How will the Phoenix adapt without their key player? Will they be able to overcome this challenge and maintain their playoff aspirations? The outcome of this game could have significant implications for the season's final stretch, making it a must-watch for basketball enthusiasts.

Stay tuned as the Phoenix strive to keep their playoff hopes alive, and the 36ers aim to extend their lead at the top of the ladder.

NBL26: Phoenix vs Adelaide | Sobey Out, Who Steps Up? (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Ouida Strosin DO

Last Updated:

Views: 6313

Rating: 4.6 / 5 (76 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Ouida Strosin DO

Birthday: 1995-04-27

Address: Suite 927 930 Kilback Radial, Candidaville, TN 87795

Phone: +8561498978366

Job: Legacy Manufacturing Specialist

Hobby: Singing, Mountain biking, Water sports, Water sports, Taxidermy, Polo, Pet

Introduction: My name is Ouida Strosin DO, I am a precious, combative, spotless, modern, spotless, beautiful, precious person who loves writing and wants to share my knowledge and understanding with you.