Sophie Turner as Lara Croft: First Look & What to Expect from the New Tomb Raider Series (2026)

Is this what Sophie Turner's Lara Croft will look like in the new Tomb Raider series? The Tomb Raider franchise has seen several live-action adaptations, with the iconic character first portrayed by Angelina Jolie in 2001's Lara Croft: Tomb Raider. The sequel, Lara Croft: Tomb Raider - The Cradle of Life, followed in 2003. Alicia Vikander took on the role in a 2018 reboot, which drew inspiration from the recent game at the time. Now, Phoebe Waller-Bridge is bringing the franchise back to life with a new Prime Video series, and Sophie Turner is set to play the title role. Turner posted a photo on her Instagram of her Lara Croft look, donning the classic game attire, complete with gun holsters, iconic short shorts, a green top, and round sunglasses. Waller-Bridge, a self-proclaimed fan of the classic games, expressed her excitement, saying, 'If I could tell my teenage self this was happening, I think she'd explode.' The series is a collaboration between Story Kitchen, Crystal Dynamics, and Amazon MGM, with Chad Hodge and Jonathan Van Tulleken as executive producers. Tulleken will also direct the production, while Waller-Bridge and Jenny Robbins executive produce via Wells Street Productions. The project promises to bring the thrilling world of Tomb Raider to life on television, and fans are eager to see Turner's interpretation of Lara Croft.

Sophie Turner as Lara Croft: First Look & What to Expect from the New Tomb Raider Series (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Prof. Nancy Dach

Last Updated:

Views: 5814

Rating: 4.7 / 5 (77 voted)

Reviews: 84% of readers found this page helpful

Author information

Name: Prof. Nancy Dach

Birthday: 1993-08-23

Address: 569 Waelchi Ports, South Blainebury, LA 11589

Phone: +9958996486049

Job: Sales Manager

Hobby: Web surfing, Scuba diving, Mountaineering, Writing, Sailing, Dance, Blacksmithing

Introduction: My name is Prof. Nancy Dach, I am a lively, joyous, courageous, lovely, tender, charming, open person who loves writing and wants to share my knowledge and understanding with you.