Space Weather Update: Potential CME Interaction and CH HSS (2026)

Space Weather Update: A G2 (Moderate) Watch is in Effect (2-5 December 2025)

Stay informed about the potential space weather impacts as a G2 (Moderate) Watch is in effect from 3 to 4 December UTC. This watch is issued due to the anticipated interaction between a nearby coronal mass ejection (CME) and an inbound coronal hole high-speed stream (CH HSS).

During this period, you may experience:
- Weak or minor degradation of HF radio communication on the sunlit side, with occasional radio contact loss.
- Low-frequency navigation signals may be degraded for brief intervals.

For more detailed information about the NOAA Space Weather Scales, visit: https://www.spaceweather.gov/noaa-scales-explanation

Remember to stay tuned to spaceweather.gov for the latest updates and alerts.

Space Weather Update: Potential CME Interaction and CH HSS (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Tyson Zemlak

Last Updated:

Views: 5854

Rating: 4.2 / 5 (43 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Tyson Zemlak

Birthday: 1992-03-17

Address: Apt. 662 96191 Quigley Dam, Kubview, MA 42013

Phone: +441678032891

Job: Community-Services Orchestrator

Hobby: Coffee roasting, Calligraphy, Metalworking, Fashion, Vehicle restoration, Shopping, Photography

Introduction: My name is Tyson Zemlak, I am a excited, light, sparkling, super, open, fair, magnificent person who loves writing and wants to share my knowledge and understanding with you.