Texas Longhorns Dominate Texas A&M | Full Game Grades and Breakdown (2026)

Texas football's dominant performance against Texas A&M showcased their potential for the College Football Playoff. The Longhorns' 27-17 victory at Royal-Memorial Stadium was a testament to their resilience and depth, overcoming a shaky first half to outshine the Aggies. With a season record of 9-3 and 6-2 in the SEC, Texas is now in the running for the CFP, but the ultimate decision rests with the selection committee.

The Longhorns' offensive prowess was evident, with quarterback Arch Manning leading the way. Despite early-season accuracy issues, he showcased his talent in the second half, throwing for 127 yards and a touchdown on 6-of-7 passing. Running back Quintrevion Wisner dominated, rushing for a season-high 155 yards on 19 carries, contributing to a balanced offense. The receiving corps, including tight end Jack Endries, had a solid performance, with Endries making four catches for 93 yards.

The offensive line played a crucial role, giving Manning ample time to throw and paving the way for a strong running game. The defensive line, led by senior defensive end Ethan Burke, had a stellar performance, with Burke recording a career-high nine tackles and blocking a field goal. The linebackers, despite the absence of All-American Anthony Hill Jr., held up against the Aggies' potent offense, limiting them to just 337 yards.

The secondary, including safety Michael Taaffe and Kobe Black, made crucial plays with two late interceptions. Special teams coordinator Jeff Banks' unit had a strong performance, with Burke blocking a field goal and punter Jack Bouwmeester averaging 48.9 yards on his punts. Coach Steve Sarkisian's strategic adjustments in the first half were instrumental in the team's success.

Texas football's win over Texas A&M was a display of their overall strength and potential, leaving the CFP selection committee with a challenging decision.

Texas Longhorns Dominate Texas A&M | Full Game Grades and Breakdown (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: The Hon. Margery Christiansen

Last Updated:

Views: 5510

Rating: 5 / 5 (70 voted)

Reviews: 85% of readers found this page helpful

Author information

Name: The Hon. Margery Christiansen

Birthday: 2000-07-07

Address: 5050 Breitenberg Knoll, New Robert, MI 45409

Phone: +2556892639372

Job: Investor Mining Engineer

Hobby: Sketching, Cosplaying, Glassblowing, Genealogy, Crocheting, Archery, Skateboarding

Introduction: My name is The Hon. Margery Christiansen, I am a bright, adorable, precious, inexpensive, gorgeous, comfortable, happy person who loves writing and wants to share my knowledge and understanding with you.